Pakistan 1,500t/d Copper Mineral Processing Plant
CASES

Pakistan 1,500t/d Copper Mineral Processing Plant

The raw ore was characterized by simple composition. It consisted of metallic minerals (copper pyrite and pyrite) and non-metallic minerals (quartz and chlorite). The multi-element analysis results showed that Cu was the valuable element. The Cu grade of the raw ore was 0.80%.

Xinhai Solution

01

Concentrates dewatering and drying: qualified tungsten concentrates from the shaking table flowed by gravity to the settling pond, and then the gained concentrates were dried on the heating earthen bed. Tailings dry stacking: tailings from the second and third spiral chute units entered the dewatering screen, and then were moved to other places by trucks. The water was recycled after clarification in the settling pond.

02

Concentrates dewatering and drying: qualified tungsten concentrates from the shaking table flowed by gravity to the settling pond, and then the gained concentrates were dried on the heating earthen bed. Tailings dry stacking: tailings from the second and third spiral chute units entered the dewatering screen, and then were moved to other places by trucks. The water was recycled after clarification in the settling pond.

03

Concentrates dewatering and drying: qualified tungsten concentrates from the shaking table flowed by gravity to the settling pond, and then the gained concentrates were dried on the heating earthen bed. Tailings dry stacking: tailings from the second and third spiral chute units entered the dewatering screen, and then were moved to other places by trucks. The water was recycled after clarification in the settling pond.

04

Concentrates dewatering and drying: qualified tungsten concentrates from the shaking table flowed by gravity to the settling pond, and then the gained concentrates were dried on the heating earthen bed. Tailings dry stacking: tailings from the second and third spiral chute units entered the dewatering screen, and then were moved to other places by trucks. The water was recycled after clarification in the settling pond.

Project Result

Finally, the grade of copper concentrate was 20.780%, and the recovery rate of copper was up to 90.05%.