The Tanzania 1,200t/d gold mineral processing plant was an EPC+M+O project. The ore consisted of sulfide (10.7g/t) and oxide (2.4g/t), with Au being the only valuable element. They achieved a leaching rate of 93.75% and 91.58% respectively through the all-slime cyanidation gold extraction process.
Gravity separation stage adopted jigging machine to separate concentrate.
Gravity separation stage adopted jigging machine to separate concentrate.
Gravity separation stage adopted jigging machine to separate concentrate.
Gravity separation stage adopted jigging machine to separate concentrate.
The Tanzania 1,200t/d gold mineral processing plant was an EPC+M+O project. The ore consisted of sulfide (10.7g/t) and oxide (2.4g/t), with Au being the only valuable element. They achieved a leaching rate of 93.75% and 91.58% respectively through the all-slime cyanidation gold extraction process.